Jump to content

Asclepius

Board Member
  • Posts

    2
  • Joined

  • Last visited

Everything posted by Asclepius

  1. While I am North of the 49th parallel, the pricing you mention for the project is just silly, even in Canadian dollars. I would have expected each elevation to take the better part of a day factoring in load / unload, travel to site, set-up, hazard assessments, installation, wiring, etc........especially on tilt up (not like going through EIFS). In Canada, I would expect that contract would be worth, at a minimum, $2400.00. The most profitable word we can ever use is "NO".
×
  • Create New...