Jump to content

ELECTRIC SIGN SUPPLIES

If You're Looking For Premium Electric Sign Industry Components Like Trim Cap, LED's, USHIO LED Lamps, Neon Supplies, or LED Power Supplies, Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!

Buy Now

NATIONAL SIGN & SERVICE COMPANY REVIEW LIST

For Sign Company's Who Work As Subcontractors

Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

You Must Be A Registered Member & A Subcontractor
Click Here

MEMBER LOCATION MAP

Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call? Locate a Supplier or Advertiser Regarding Thier Goods & Services?

Become a Member & Upgrade Your Free Membership So Others Can Locate You
Click Here
shooter

Sign installation code

Recommended Posts

Does anyone know of a government backed sign installation code? I looked at the state level and found nothing pertaining to sign installations. The reason I'm asking is, we recently completed and installed a 4' x 6' projected sign. As standard in this type of installation(at least in my 20 years of experience). We added to guy wires for additional support. The city had originally approved the sign permit application, but now says that their code does not allow guy wires. The suspension cables were not shown in the drawing. Any help would be greatly appreciated.

post-1122-1257260263.jpg

post-1122-1257260281.jpg

post-1122-1257260308.jpg

post-1122-1257260376.jpg

Share this post


Link to post
Share on other sites
Does anyone know of a government backed sign installation code? I looked at the state level and found nothing pertaining to sign installations. The reason I'm asking is, we recently completed and installed a 4' x 6' projected sign. As standard in this type of installation(at least in my 20 years of experience). We added to guy wires for additional support. The city had originally approved the sign permit application, but now says that their code does not allow guy wires. The suspension cables were not shown in the drawing. Any help would be greatly appreciated.

It's not exactly on topic, but the 2006 International Building Code, Appendix H (Signs), Section H112 (Projecting Signs) does speak to the subject of Attachment of Supports and mentions supporting chains, guys, or steel rods.

However, the first sentence of Appendix H reads "The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance." Unfortunately, I can't cut-and-paste the pages of the IBC because it is a copyrighted publication of the International Code Council. And I have no idea if Minnesota has adopted the 2006 building code in general or Appendix H specifically. (Many states only update their codes every 2nd or 3rd international code cycle)

Share this post


Link to post
Share on other sites
It's not exactly on topic, but the 2006 International Building Code, Appendix H (Signs), Section H112 (Projecting Signs) does speak to the subject of Attachment of Supports and mentions supporting chains, guys, or steel rods.

However, the first sentence of Appendix H reads "The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance." Unfortunately, I can't cut-and-paste the pages of the IBC because it is a copyrighted publication of the International Code Council. And I have no idea if Minnesota has adopted the 2006 building code in general or Appendix H specifically. (Many states only update their codes every 2nd or 3rd international code cycle)

Thank you!

Attached is my response to the building official

Nate, I need to talk to you about this sign. There are a few issues with it: 1) thickness 2) spot/beacon light which was not shown on submitted plans 3) electrical permit has not been issued 4) the use of guy wires to support signs is prohibited per code. There is a guy wire supporting this sign, and this was not shown on the plan. If the sign cannot be supported without the use of a guy wire, I suggest it either comes down or it needs to be rescaled.

I don't have your phone number, so if you could give me a call, I would appreciate it.

I have been made aware that the down lighting fixture is not permitted. It will be removed. I did not contract the electrician, The client did. The electrician will be responsible for pulling the electrical permit. I forwarded him the permit application, weeks prior to the sign installation. This sign is self-supporting, without the guy wires. They are merely a safety factor for winds. This is a standard installation technique for projected signs, regardless of their size. We were simply following the national building code which states.

SECTION H112 PROJECTING SIGNS

H112.1 General. Projecting signs shall be constructed entirely of metal or other noncombustible material and securely attached to a building or structure by metal supports such as bolts, anchors, supports, chains, guys or steel rods. Staples or nails shall not be used to secure any projecting sign to any building or structure. The dead load of projecting signs not par- allel to the building or structure and the load due to wind pres- sure shall be supported with chains, guys or steel rods having net cross-sectional dimension of not less than 3/8 inch (9.5 mm) diameter. Such supports shall be erected or maintained at an angle of at least 45 percent (0.78 rad) with the horizontal to resist the dead load and at angle of 45 percent (0.78 rad) or more with the face of the sign to resist the specified wind pres- sure. If such projecting sign exceeds 30 square feet (2.8 m2) in one facial area, there shall be provided at least two such sup- ports on each side not more than 8 feet (2438 mm) apart to resist the wind pressure.

H112.2 Attachment of supports. Supports shall be secured to a bolt or expansion screw that will develop the strength of the supporting chains, guys or steel rods, with a minimum 5/8 inch (15.9 mm) bolt or lag screw, by an expansion shield. Turn buck- les shall be placed in chains, guys of steel rods supporting pro- jecting signs.

H112.3 Wall mounting details. Chains, cables, guys or steel rods used to support the live or dead load of projecting signs are permitted to be fastened to solid masonry walls with expansion bolts or by machine screws in iron supports, but such supports shall not be attached to an unbraced parapet wall. Where the supports rnust be fastened to walls made of wood, the supporting anchor bolts must go through the wall and be plated or fastened on the inside in a secure manner.

Share this post


Link to post
Share on other sites
Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.




  • Topics

  • Posts

    • make that 2 legs & i love it!
    • At 68 and still installing part time for other companies. We are in the same boat, companies having problems finding good help. One problem is that employees need benefits, can't raise a family with out them. Surprised how many employers do not offer this and also underpay. When some employers get an experienced employee the tend to jam the long hours to them. So guys like others do not. In my case I worked out of town last week and put in 62 hrs in 4 days and the guy I am helping out was pissed when I didn't want work the Friday.  I ran my ran my own company for 44 yrs, from my experience a lot of companies do not have a company policy that is review and signed with new employees, I find a lot of employers their communication skills suck, resulting in new and old employees screwing up, and tend to slam the work at their people. When my employees were acquiring a huge amount of overtime, it was time to put another crew on the road. For our Royal Bank in Canada, I have mentored many business, not too many in the sign business, but finding good reliable help is every ones problem. I tell it how it is during the hiring process, and encouraged my employees to vocal their problems with me without the risk of being fired. I don't know with I am an expert, but when i retired I ha 3 employees with 20 plus years and 1 with 30yrs.  And sure if found a good employee who was willing to learn, we taught them, but also rewarded them with bonus's and gift cards. I figure it takes a good 2 yrs or better to train some one and a sure loss if you lose them to your competitor. Thanks for letting me ramble on.
    • Just my personality showing thru!  Some old Grey farts still appreciate craftsmanship! 
    • Gary;   I think you and the other posters are being way too harsh and just not showing appreciation of the Creativity of this repair and the one listed by my friend Angie.   These are the times we currently find ourselves navigating...........   Peace out  
    • PK HOUSINGS   PK, or Neon P-K Housings are harder and harder to find these days with no major Neon Manufacturer still producing the Metal Shroud portion of a PK Housing.  Westrim??  Nope....Transco?  Nope....Allanson?  Nope...    In fact, it's been nearly impossible to find New complete PK Housings.    The only way in the last couple of years if you had a Neon Project for a client has been to find existing stock from a sign company that has had some just sitting on a old dusty shelf somewhere, or possibly a sign supplier who didn't even know they had any, and with LEDs flooding the market it's doubtful a supplier rep even knows what they are/were, and that dusty case they do have with all those strange metal & glass components was possibly spare parts for some old delivery truck their company use to have from the 90's???      Think of how many have just been straight thrown out in the garbage   Well, not every Neon wall project calls for #200, #300 Housings, the difficult Masters Technologies Boots and Sleeving System.  If you want a Neon attached to on a wall for a clean look & without a raceway, YES...it IS still possible!!!   We've been sitting on these for some time, sorry for the late public announcement   Store Link of Neon Housings http://www.thesignsyndicate.com/forums/index.php?/store/category/8-neon-housing-components/       Call or Email us for questions or orders!!  orders@thesignsyndicate   (858) 880-1400    