Two days ago we installed 4 Directories for a Condo Project. 2 of signs are 3'x4' and 2 are 4'x3'.. Basicly we put two sign in the wrong Opposing spots and they need to be switched. The signs are made of aluminum and have a 4" pole with a 24" Deep x 8" to12" Wide footing.
My question is should I rent a pipe cutter and cut the pipes, Switch the signs and weld the sign back on. OR Dig up the footings and switch the signs. The cement is 48 hours old and I'm thinking I can split the footing, pull the signs out and switch them and drill a hole in the base to put in a spin tab and re cement. the signs as I received them did not have a spin tab at the bottom so they may be able to come out of the cement.
Any Ideas?
Signs.pdf