Jump to content

ELECTRIC SIGN SUPPLIES
If You're Looking For Premium Electric Sign Industry Components From Trim Cap, LED's, Neon Supplies, Power Supplies, Pattern Paper.  Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!
Buy Now

SIGN INSTALLER MAP
Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call?
Click Here

For Sign Company's Who Work As Subcontractors
Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

Click Here

Recommended Posts

Posted

Sign Installer/Service Tech Position Available

Signs Plus Inc. has been in business in Bellingham Washington since 1992. We consult, design, engineer, manufacture, install, and service all types of signage throughout the Pacific Northwest. At Signs Plus Inc. our employees make the difference. Our goal is to hire the best! If you are hard-working, a self-starter, looking for a challenging and rewarding career with a growing company, with a great future, and meet the following criteria, than we have a position for you!


Requirements:
• Applicant must possess a Journeyman Sign Electrician License from the State of Washington.
• Must take pride in work, have a good eye for detail, and possess a positive, get it done attitude.
• Have a strong work ethic and able to work quickly, efficiently, and accurately in a deadline environment.
• Physically fit, able to lift 75 lbs. and be OK with working at heights and in confined spaces.
• Able to read and understand detailed shop drawings, site plans, and sign location drawings.
• Must have experience operating Crane/Ladder Trucks.
• Must have a clean driving record and a CDL-B license.

 

We offer an excellent Benefits Package that includes the follow: 
• Competitive wage
• 75% paid health insurance for employees after 60 days of employment
• 401K Plan

• Paid holidays and vacation
• Consistent 40-50 hour work weeks all year

A pre-employment background check and drug screen are required.

 

Contact:

Send your resume to: jims@signsplusnw.com

Attn: Jim Sutterfield

Signs Plus Inc

766 Marine Drive

Bellingham, WA 98225

Tel: 360-671-7165

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Topics

  • Posts

    • I didn't take the job.   And before I did anything for a company like them, I'd have to set up an ach block.   Otherwise, per my banker, it's possible that they can do a reverse ACH.   My bankers has been after me to set that up, though there is a monthly fee.   sigh, there's a monthly fee to just about anything with banks.   Paul, keeping busy i hope?    Rocco
    • Take the Money 1st. ACH the money. Then do the job.  *** Credit Cards can be cancelled up to 18 months ***
    • Wow, you will have to root through "their" protections.
    • A national sign company that I've dealt with for at least twenty-five years wants us to sign their vendor packet again this year.   At first it was a few pages but grew over time.   Last year it was fifteen pages.   Now it's twenty-two pages., plus a three page NDA.   I will have someone look it over and give me their opinion but it's getting ridiculous.    Their paperwork pusher will say that its' all "standard things" but standard for who and in whose favor?   Even if they gave me a ton of work, and it's only been one or two jobs a year recently, I'd be hesitant.   if i didn't know someone that does contacts for a living, I'd have to pay an attorney to go over this packet.    This is a national that has a good rep but it's getting to the point that we all need an attorney on hand at all times to go over paperwork.    Rant over.
    • This is the late April 2026 Update   This month we added in: GE's TX GEN4 12v .9w 6500K LED Module     G2G's WOW II Red 12V .72W     Also Including the GWH IV Snap Shot of the Project which is also included in the April Evaluation PDF Sheet.   The most important thing to take notice i2 the FC / Watt (Foot Candles per Watt).    This is the LED Chip Quality and Efficiency, this is the amount of Light Per Power.  The bigger the number the more efficient that Light Source is.  You might see a Higher Wattage LED Module with a low FC/Watt value, that means it's not too efficient....could even be pushed and in some cases over driven running hot, which can result in shorter life.   I'm going to drop an example to put things in perspective. Let's take two 2LED Modules...the Brighton - II, and the EveryLite Rebel LED Module.   The Brighton II is .8 watts, the EveryLite Rebel is almost a 1 watt Module at .96w   The 362 Foot Candle average EveryLiteRebel is brighter than the B-II Module at 348.5 FC AVG.  However the B-II Module has a 108.91 Foot Candle Per Watt Average.    So if we were to boost the Module Power of the Brighton - II and make it say, a .84w module instead of a .8w module then we can project the Brighton II Module with Foot Candle per Watt of 108.91 to have a Foot Candle Average of 365.93.   The .84w Brighton - II Module would be brighter, under driven, and more efficient than the .96w EveryLite Rebel.   Now the Flip Side...   If we made the .96w EveryLite Module to a .8w Module apples to apples to the Brighton - II Module, we can project the Foot Candle of the .8watt EveryLite Module would be 301.66 instead of the 362 FC Average.  You can see the Handicap here   So Boosting the power of so-so chips will give you more light for the "Wow" factor, but in some case is over driving, there is more heat involved....and like all electronics...they hate and fail with heat.  This is why a lot of LED MFG's recently make a 2 LED almost 1 watt Module and sell for $40 a bag....   Just something to take note of.....          On another Note, I will be taking down the TBA Vendor as the light is too low, and the Principal / Sloan Prism Module as it is dated   April's 2026 GWH IV Sheet GreatWhiteHope IV 042826 WOA.pdf
×
  • Create New...