Jump to content

ELECTRIC SIGN SUPPLIES
If You're Looking For Premium Electric Sign Industry Components From Trim Cap, LED's, Neon Supplies, Power Supplies, Pattern Paper.  Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!
Buy Now

SIGN INSTALLER MAP
Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call?
Click Here

For Sign Company's Who Work As Subcontractors
Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

Click Here

F'd Up Demo!


derf

Recommended Posts

Check out the old sign! it was lose so I figured we would have it out the ground in like an hour or less..

Now check out the old footings! GD.. :bitchin: :wtf: .... 2) 1/4"x6 steel with rebar in concrete... :wtf: were they trying to do hold up a frick'n bridge... it took us about 2.5 hours to :construction::jackhammer: jack hammer all the crap up and bend the rebar back into the ground..

Now check out the New Sign.... Sweet! it looks way better then I thought it would. :beer-1:

post-403-1159920829.jpg

Link to comment
Share on other sites

:wtf: .... 2) 1/4"x6 steel with rebar in concrete... :wtf: were they trying to do hold up a frick'n bridge...

Old school thinking (which definitely has its merits in today's "only interested in bottom line profits" business mentality these days) of making it to last as long as possible. Personally I see nothing wrong with that approach and thought process. If more U.S. corporations still thought that way we would still be exporting more than we are importing instead of the other way around.

Very nice replacement sign you did though. :thumbs:

Link to comment
Share on other sites

Yeah it was a very well made footing... it just sucks pulling it out when someone does such a good job installing it. I'm sure some one is going to bitch when they have to pull out my 4.5" pipe in a 12" wide x 28' deep with an anti spin flange welded at the bottom...

Thanks for the complement too

Link to comment
Share on other sites

Yeah it was a very well made footing... it just sucks pulling it out when someone does such a good job installing it. I'm sure some one is going to bitch when they have to pull out my 4.5" pipe in a 12" wide x 28' deep with an anti spin flange welded at the bottom...

Thanks for the complement too

Cool! Yeah, they'll bitch. But that's a compliment too :thumbs:

Link to comment
Share on other sites

  • 1 month later...
I'm sure some one is going to bitch when they have to pull out my 4.5" pipe in a 12" wide x 28' deep with an anti spin flange welded at the bottom...

Down here you would never see a footer like that. Most footers don't go more then 48" deep.

I have seen some monster footers pulled out of the ground with motor cranes. The company I work for now always seems to want to pull old footers. Back hoes digging around the footer and 50 ton cranes pulling at critical lift weights and they can't get them out.

We had one that the guys were gonna install and they hit an old footer. I told them to dig to the edges and then get me the depth. The footer was like 25' across and 25' wide and like 5' deep or what ever. This was a little monument like the one shown and my boss didn't want to use the existing footer!

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Topics

  • Posts

    • It depends on what's under the EIFS.   If it's plywood under the foam, then toggles are fine for a lightweight sign.  If masonry, we've come to like the titen HD (simpson strong tie brand) anchors or long wedge anchors.   The Titen HD screws are more user friendly than tapcons IMO.   They come in a variety of sizes, sometimes even at the big home centers.   Just check to see if it's densglass (fiberglass wall panels) under the foam.  Engineeners have told us that densglass isn't "structural" and that things need to be thru-bolted with uni-strut (or equal) sleepers across studs inside the wall.  A few years back, we were called out for an emergency call where someone had installed some large raceway channel letter signs to an EIFS wall that had densglass behind.  They used lag screws.  These held for a while but a heavy snow caused them to fail.   And toggles should work with Densglass but again not for any heavy loads.    In any case don't compress the foam too much.  A sleeve (mentioned above) would be needed for whatever the depth of the foam might be, though probably not needed for something light like an ACM panel.   if it's a really small sign, then appropriate exterior screws are usually OK going into plywood.  
    • Interested in neon manifold for my personal shop 484 862 6095 ask for Johnny
    • Are there any recommendations for the best types of anchors to use for lightweight signs on EIFS?  <a href=" https://www.phoenixstuccocontractor.com/"> Phoenix Stucco Contractors</a>
    • Hi   Can anyone tell me the right color red and blue translucent vinyl for the "new" Pepsi logo?  We have a local ice cream spot that recently changed from Coke to Pepsi and we have to replace the graphics on a couple of lit cabinets.   The customer sent me the logo in various formats but it didn't specify the correct colors.   I've searched but keep getting CYMK, etc. for the older logo - 2022 or so.   Thanks!
×
  • Create New...