Jump to content

ELECTRIC SIGN SUPPLIES
If You're Looking For Premium Electric Sign Industry Components From Trim Cap, LED's, Neon Supplies, Power Supplies, Pattern Paper.  Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!
Buy Now

SIGN INSTALLER MAP
Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call?
Click Here

For Sign Company's Who Work As Subcontractors
Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

Click Here

Recommended Posts

  • Board Patron
Posted

So our local county is forcing us to provide landscaping for monument signs - can't do just grass, there hasto be "shrubs and evergreen ground cover".  They are insisting that this be done before the final inspection is requested, if it's not done they will charge an additional inspection fee.

 

Has anyone else run into this?  What did you do to comply?

  • Board Patron
Posted

Never have run into it but there seems like a obvious answer. Dig out your rakes and shovels or find a sub and make it another line item on your bill or have the customer take care of it

  • Board Patron
Posted

Years ago when I had a full service sign co. I did a sign for a city that was a welcome to....  I had to get sign permits but the public works dept was going to install the sign.  I had to go before a sign/design review board. I only provided eng and shop drawings. They rejected it even though the city was going to install and do the planting.  I laughed at them and said fine and to the cities purchasing dept they can handle it from here and will deliver the sign in a few weeks.

 

Government at its finest 

  • Board Patron
Posted

Just another cost for the customer - and where there's landscaping, there has to be water, even in the Pacific NW.  Plants die in the summer with out it.  I don't object to the landscaping, I object that it's the responsibility of the sign company to do it.  Should be part of the occupancy permit.  (and if the customer doesn't get an occupancy permit, we can't get the sign permit issued).

  • Board Patron
Posted

Many towns now require landscaping and irrigation plans from a landscape architect  (specifically for the monument sign) along with the plans for the monument sign before zoning will approve sign.  Nobody said sign company has to pay for it, that is part of the conditions portion of your contract where you point out the extras they will need to pay for additionally like the City Fees for review and inspections. 

  • Like 1
Posted

I've run into this before but it's been years.

 

Never directly with the city but under circumstances where I'm in front of a neighborhood review design committee, you know.....where you're seeking an approval before you go to the city and you sit in front of a bunch of @s$hole long-haired hippies who have an opinion about everything other than your project and they just like to hear themselves talk. 

 

:P:focus:

 

The pride swallowing situations we find ourselves just for an approval

  • Like 1

You have enemies? Good. That means you've stood up for something, sometime in your life. - Winston Churchill

Posted

There are several Cities around here that require landscaping with monuments. The problem, of course, is that we aren't landscapers and have no interest in discussing different types of plants and arrangements with our customers. So, we leave the landscaping up to them.

 

But then the City holds our permit hostage, and ultimately our license, until the customer gets their landscapers to do the work. But, since they alrady have their sign, they aren't very motivated to pay that landscaper just because we tell them they need to.

 

Same problem with electrical. The City holds our license hostage  until the Electrician finals out their part of the job, and there's nothing we can do about it.

 

I don't really have a solution other than subcontracting the landscaping and electrical, which is a hornets nest of problems. Either that or just don't bother getting a permit in the first place (which is what an increasingly large number of sign companies are doing).

 

  • Board Patron
Posted
4 hours ago, jamesw001 said:

I don't really have a solution other than subcontracting the landscaping and electrical, which is a hornets nest of problems. Either that or just don't bother getting a permit in the first place (which is what an increasingly large number of sign companies are doing).

 

Or don't sell monument signs if it seems like a hassle.

 

Installing them without permits simply sounds like you don't give a damn except for making money off the customer.  He can just buy another one when he gets popped for the illegal one.

 

The reason they apply the pressure on the sign company is because if it weren't for the Sign and you making a profit on it,  the other two  (landscaping and electric circuit to the spot) wouldn't be needed.   If customer can't afford the landscape architect, bushes, irrigation and electric line then he has high hopes for a broke ass budget.  I know, but you still want your sign money.  

 

The increasingly large number of sign companies line..... just sounds like a "lemming" story or fake news born from sign builders who don't care about the pesky issues of getting sign permits for proper installs.  

Posted
2 hours ago, Mad Scientist said:

 

Or don't sell monument signs if it seems like a hassle.

 

Installing them without permits simply sounds like you don't give a damn except for making money off the customer.  He can just buy another one when he gets popped for the illegal one.

 

The reason they apply the pressure on the sign company is because if it weren't for the Sign and you making a profit on it,  the other two  (landscaping and electric circuit to the spot) wouldn't be needed.   If customer can't afford the landscape architect, bushes, irrigation and electric line then he has high hopes for a broke ass budget.  I know, but you still want your sign money.  

 

The increasingly large number of sign companies line..... just sounds like a "lemming" story or fake news born from sign builders who don't care about the pesky issues of getting sign permits for proper installs.  

 

I agree with you about companies that install signs without a permit. They are just hoping the check clears before the City notices it ... then they can start blocking the customer's calls.

 

It happens.

 

The City of Dallas Chief Building Official was talking to me about four weeks ago about a company that installed a big LED sign right off the highway without getting a permit. The City has restricted LED signs quite a bit (in a ridiculous manner, if you ask me) and this LED sign was not legal under the current ordinance. He wanted my opinion on what it would take to pull the sign down.

 

I came across another one on the southern part of the City where we needed to change a face on the sign and I was shocked that they were ever allowed to install the sign so close to the property line. So I pulled an Open Records request (it's easy to do in Dallas) and found they never did pull a permit.

 

Yet another time, in Arlington, I was called out to service a neon sign (this was a few years ago) and when I got there everything was exposed, no conduit, etc. Well, Arlington does on-site inspections so I called the Inspector (great guy, we've dealt with him for years and he's always been incredibly helpful) and asked him how this managed to pass inspection. He told me they never got a permit in the first place. 

 

 

The part that bothers me the most is if that customer came to me asking for a sign I wouldn't get the order because I know I can't permit it. The dishonest guy gets the order but the customer ultimately pays the price.

 

  • Like 1
  • Board Patron
Posted

One way to look at it is that you are not as hard up as the illegal sign co. and you are doing the owner a favor by pointing out what it takes to do it the right way.  If I were the owner I can get over the bad news but am not left holding the illegal bag so to speak.

Additionally  the customer who has the $$$ to do it the right way is the customer you are looking for.  I don't need the cheapskate and his friends calling me for free consultations because the bottom line is cheap or free. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Topics

  • Posts

    • I didn't take the job.   And before I did anything for a company like them, I'd have to set up an ach block.   Otherwise, per my banker, it's possible that they can do a reverse ACH.   My bankers has been after me to set that up, though there is a monthly fee.   sigh, there's a monthly fee to just about anything with banks.   Paul, keeping busy i hope?    Rocco
    • Take the Money 1st. ACH the money. Then do the job.  *** Credit Cards can be cancelled up to 18 months ***
    • Wow, you will have to root through "their" protections.
    • A national sign company that I've dealt with for at least twenty-five years wants us to sign their vendor packet again this year.   At first it was a few pages but grew over time.   Last year it was fifteen pages.   Now it's twenty-two pages., plus a three page NDA.   I will have someone look it over and give me their opinion but it's getting ridiculous.    Their paperwork pusher will say that its' all "standard things" but standard for who and in whose favor?   Even if they gave me a ton of work, and it's only been one or two jobs a year recently, I'd be hesitant.   if i didn't know someone that does contacts for a living, I'd have to pay an attorney to go over this packet.    This is a national that has a good rep but it's getting to the point that we all need an attorney on hand at all times to go over paperwork.    Rant over.
    • This is the late April 2026 Update   This month we added in: GE's TX GEN4 12v .9w 6500K LED Module     G2G's WOW II Red 12V .72W     Also Including the GWH IV Snap Shot of the Project which is also included in the April Evaluation PDF Sheet.   The most important thing to take notice i2 the FC / Watt (Foot Candles per Watt).    This is the LED Chip Quality and Efficiency, this is the amount of Light Per Power.  The bigger the number the more efficient that Light Source is.  You might see a Higher Wattage LED Module with a low FC/Watt value, that means it's not too efficient....could even be pushed and in some cases over driven running hot, which can result in shorter life.   I'm going to drop an example to put things in perspective. Let's take two 2LED Modules...the Brighton - II, and the EveryLite Rebel LED Module.   The Brighton II is .8 watts, the EveryLite Rebel is almost a 1 watt Module at .96w   The 362 Foot Candle average EveryLiteRebel is brighter than the B-II Module at 348.5 FC AVG.  However the B-II Module has a 108.91 Foot Candle Per Watt Average.    So if we were to boost the Module Power of the Brighton - II and make it say, a .84w module instead of a .8w module then we can project the Brighton II Module with Foot Candle per Watt of 108.91 to have a Foot Candle Average of 365.93.   The .84w Brighton - II Module would be brighter, under driven, and more efficient than the .96w EveryLite Rebel.   Now the Flip Side...   If we made the .96w EveryLite Module to a .8w Module apples to apples to the Brighton - II Module, we can project the Foot Candle of the .8watt EveryLite Module would be 301.66 instead of the 362 FC Average.  You can see the Handicap here   So Boosting the power of so-so chips will give you more light for the "Wow" factor, but in some case is over driving, there is more heat involved....and like all electronics...they hate and fail with heat.  This is why a lot of LED MFG's recently make a 2 LED almost 1 watt Module and sell for $40 a bag....   Just something to take note of.....          On another Note, I will be taking down the TBA Vendor as the light is too low, and the Principal / Sloan Prism Module as it is dated   April's 2026 GWH IV Sheet GreatWhiteHope IV 042826 WOA.pdf
×
  • Create New...