Jump to content

ELECTRIC SIGN SUPPLIES
If You're Looking For Premium Electric Sign Industry Components From Trim Cap, LED's, Neon Supplies, Power Supplies, Pattern Paper.  Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!
Buy Now

SIGN INSTALLER MAP
Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call?
Click Here

For Sign Company's Who Work As Subcontractors
Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

Click Here

Recommended Posts

Posted

Good morning all,

We at MCS supply joystick controllers for aerial lift, cranes, bucket trucks, scissor lifts and boom lifts to name a few. If your looking for a joystick and want to save some money give us a call.

928 775-4918.

Thanks,

BOOM TRUCK FLIER DUN72.pdf

  • Board Patron
Posted

Great people to work with. We have purchased new ones and have had them do rebuilds.

Installation & Maintenance Services

Brian Phillips | expresssignandneon@sbcglobal.net | P. 812-882-3278

Express Sign & Neon | 119 S. 15th Street - Vincennes - IN 47591

express%20neon%20sig.jpg

Posted

Brian,

Thanks for the reply, great doing business with you.

We appreciate your business.

Have a great day,

Ben

Posted

We charge $80.00 labor plus parts to rebuild most controllers, do you know what part number your controller is? If it is 87200351 Skyhoist controller they usually run about $225.00, we sell them new for $260.00.

Thanks for the inquiry, have a great day.

Ben.

  • Board Patron
Posted

new being from the factory, you rebuilding them, or you building your own

  • Board Vendor II
Posted

Hi Keith

MCS Industrial Electronics Inc. has been in the business of rebuilding and manufacturing joystick controls, for countless types of equipment, for more than 30 years. We offer a 100% satisfaction guarantee on all of our products. We are product liability insured, and have numerous happy customers in the sign industry, one of them is Yesco. We would be happy to email a list of referrals to you if you would like us to. We offer free technical assistance for joystick-related matters. We have hundreds of joysticks in stock for same-day shipping. For more information about our company, please visit our website mcsindustrial.com. Our salesman is Ben. His direct email address is mcssales@cableone.net. If you would like to call us, our phone number is (928) 775-4918

Thank you for your interest in our company!

Frank Camp

President, MCS Industrial Electronics Inc.

Posted

We have ordered from them with satisfaction met in every department, ordered online with no problems, part showed up a few days later. I Highly recommend MCS!

  • 2 months later...
Posted

i have a bucket truck joysticks that causes hydraulics to engage very weak. I can see the lower controls vibrate trying to engage when i activate the joystick. Would this be a joystick problem?

  • Board Vendor II
Posted

Hi John,

Do all the joysticks have this symptom, or just one of them?

Regards,

Frank

  • Board Vendor II
Posted

Ah, okay. It could be as simple as adjusting the output trimpots. You can call me at (928) 775-4918 and I will be glad to help you with the adjustment procedure. I am here from 7:00 am to 3:30 pm. Arizona time.

I look forward to helping you.

Frank

  • Board Vendor II
Posted

Hi John! I am so glad I was able to save you $260.00 by helping you adjust the trimpots on your joystick controller! In just 5 minutes you were up and running! If you have any other questions or need any technical assistance with your Elliott joystick controllers, don't hesitate to call!

Frank Camp

Posted

Thank you Frank for helping me out. Frank is very knowledgeable and patient. Highly recommend!!

  • Like 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Topics

  • Posts

    • I didn't take the job.   And before I did anything for a company like them, I'd have to set up an ach block.   Otherwise, per my banker, it's possible that they can do a reverse ACH.   My bankers has been after me to set that up, though there is a monthly fee.   sigh, there's a monthly fee to just about anything with banks.   Paul, keeping busy i hope?    Rocco
    • Take the Money 1st. ACH the money. Then do the job.  *** Credit Cards can be cancelled up to 18 months ***
    • Wow, you will have to root through "their" protections.
    • A national sign company that I've dealt with for at least twenty-five years wants us to sign their vendor packet again this year.   At first it was a few pages but grew over time.   Last year it was fifteen pages.   Now it's twenty-two pages., plus a three page NDA.   I will have someone look it over and give me their opinion but it's getting ridiculous.    Their paperwork pusher will say that its' all "standard things" but standard for who and in whose favor?   Even if they gave me a ton of work, and it's only been one or two jobs a year recently, I'd be hesitant.   if i didn't know someone that does contacts for a living, I'd have to pay an attorney to go over this packet.    This is a national that has a good rep but it's getting to the point that we all need an attorney on hand at all times to go over paperwork.    Rant over.
    • This is the late April 2026 Update   This month we added in: GE's TX GEN4 12v .9w 6500K LED Module     G2G's WOW II Red 12V .72W     Also Including the GWH IV Snap Shot of the Project which is also included in the April Evaluation PDF Sheet.   The most important thing to take notice i2 the FC / Watt (Foot Candles per Watt).    This is the LED Chip Quality and Efficiency, this is the amount of Light Per Power.  The bigger the number the more efficient that Light Source is.  You might see a Higher Wattage LED Module with a low FC/Watt value, that means it's not too efficient....could even be pushed and in some cases over driven running hot, which can result in shorter life.   I'm going to drop an example to put things in perspective. Let's take two 2LED Modules...the Brighton - II, and the EveryLite Rebel LED Module.   The Brighton II is .8 watts, the EveryLite Rebel is almost a 1 watt Module at .96w   The 362 Foot Candle average EveryLiteRebel is brighter than the B-II Module at 348.5 FC AVG.  However the B-II Module has a 108.91 Foot Candle Per Watt Average.    So if we were to boost the Module Power of the Brighton - II and make it say, a .84w module instead of a .8w module then we can project the Brighton II Module with Foot Candle per Watt of 108.91 to have a Foot Candle Average of 365.93.   The .84w Brighton - II Module would be brighter, under driven, and more efficient than the .96w EveryLite Rebel.   Now the Flip Side...   If we made the .96w EveryLite Module to a .8w Module apples to apples to the Brighton - II Module, we can project the Foot Candle of the .8watt EveryLite Module would be 301.66 instead of the 362 FC Average.  You can see the Handicap here   So Boosting the power of so-so chips will give you more light for the "Wow" factor, but in some case is over driving, there is more heat involved....and like all electronics...they hate and fail with heat.  This is why a lot of LED MFG's recently make a 2 LED almost 1 watt Module and sell for $40 a bag....   Just something to take note of.....          On another Note, I will be taking down the TBA Vendor as the light is too low, and the Principal / Sloan Prism Module as it is dated   April's 2026 GWH IV Sheet GreatWhiteHope IV 042826 WOA.pdf
×
  • Create New...