Jump to content

ELECTRIC SIGN SUPPLIES
If You're Looking For Premium Electric Sign Industry Components From Trim Cap, LED's, Neon Supplies, Power Supplies, Pattern Paper.  Then Please Visit Our Online Store or Feel Free To Call Us For Inquiries or Placing an Order!!
Buy Now

SIGN INSTALLER MAP
Looking for a fellow Sign Syndicate Company Member For A Sign Install or Maintenance Call?
Click Here

For Sign Company's Who Work As Subcontractors
Before You Work For A National Sign & Service Company You Need To Look At The Reviews Of These Companies Before You Work For Them. Learn When To Expect Payment From Them and What It's Like To Work For Them, The Good, The Bad, The Ugly. Learn and Share Your Experiences Yourself For Others

Click Here

Experienced Project Manager


Recommended Posts

Please reply with Resume to:

ksharrar@creo-ia.com

No phone calls please.

Job Title: Project Manager

Position Type: Full Time

Job Summary

The primary role of the project manager is to oversee the entire environmental graphics project and ensure that the project is executed on time, on budget, and at the appropriate margins. The PM is the liason between the client and CRĒO, and must remain constantly engaged with both parties to ensure alignment. He/she monitors all phases of the project to ensure the accurate execution of the specifications, details and obligations of the contract. He/she must also track and prioritize tasks to keep multiple signtypes or projects moving through the documentation, production and installation processes on schedule.

Essential Duties and Responsibilities:

  • Assist in researching fabrication options, and creation of submittal samples, mock-ups and prototypes
  • Perform site surveys and obtain field verification data.
  • Assist in the preparation of RFI’s and reporting the reponses to be incorporated into the final shop drawings.
  • Prepare transmittals for submittal samples, patterns and drawings.
  • Prepare permit documents, submit for permit, coordinate inspections and archive original signed off documents.
  • Contract and coordinate subcontractor services
  • Manage change order process
  • Prepare a timeline of production and monitor progress, communicating with client
  • Periodically inspect production to ensure accurate interpretation of design intent
  • Coordinate shipping of completed product
  • Coordinate and manage onsite installation
  • Manage billings for the project including the preparation of a schedule of values and monthly billing projections
  • Generate and maintain detailed records of all drawings, client communictaions, contract documents, permits, and any all other project related documentation.

Requirements:

  • Detail oriented individual with strong organizational skills
  • Excellent written and verbal communication skills
  • Reasonable level of competence with office productivity software (MS Word, Excel, Project), and familiarity with Internet tools for searches, etc.
  • Ability to conduct thorough research to identify optimal materials, sub-contractor services, processes, etc.
  • Willingness to Travel

Preferred Experience:

  • Project Management experience in the construction or sign industry
  • BA Degree
  • Familiarity with any or all of the following is a plus:
    • Metal Fabrication
    • Electrical Signage
    • Graphic & Typography Processes
    • Architectural Drawings and Site Plans
    • Construction Materials & Processes

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Topics

  • Posts

    • It depends on what's under the EIFS.   If it's plywood under the foam, then toggles are fine for a lightweight sign.  If masonry, we've come to like the titen HD (simpson strong tie brand) anchors or long wedge anchors.   The Titen HD screws are more user friendly than tapcons IMO.   They come in a variety of sizes, sometimes even at the big home centers.   Just check to see if it's densglass (fiberglass wall panels) under the foam.  Engineeners have told us that densglass isn't "structural" and that things need to be thru-bolted with uni-strut (or equal) sleepers across studs inside the wall.  A few years back, we were called out for an emergency call where someone had installed some large raceway channel letter signs to an EIFS wall that had densglass behind.  They used lag screws.  These held for a while but a heavy snow caused them to fail.   And toggles should work with Densglass but again not for any heavy loads.    In any case don't compress the foam too much.  A sleeve (mentioned above) would be needed for whatever the depth of the foam might be, though probably not needed for something light like an ACM panel.   if it's a really small sign, then appropriate exterior screws are usually OK going into plywood.  
    • Interested in neon manifold for my personal shop 484 862 6095 ask for Johnny
    • Are there any recommendations for the best types of anchors to use for lightweight signs on EIFS?  <a href=" https://www.phoenixstuccocontractor.com/"> Phoenix Stucco Contractors</a>
    • Hi   Can anyone tell me the right color red and blue translucent vinyl for the "new" Pepsi logo?  We have a local ice cream spot that recently changed from Coke to Pepsi and we have to replace the graphics on a couple of lit cabinets.   The customer sent me the logo in various formats but it didn't specify the correct colors.   I've searched but keep getting CYMK, etc. for the older logo - 2022 or so.   Thanks!
×
  • Create New...